Engineering/Construction

Project Updates

2016 Project Listing
Franklin Ave (Oak to Congress) Street, Utilities
Higgins Ave (Laudan to Division) Street, Utilities
Columbian Ave (Oak to Elm) Street, Utilities
Franklin Ave (Walnut to Oak) Overlay, Utilities
Henry St (Sherry to Adams) Overlay, Utilities
Lincoln St (Third to Fourth) Overlay, Utilities
Limekiln Dr (Bayview to East) Overlay
North St (Green Bay to 670′ West) Overlay
Cavalry Ln – Castle Oak IV 2″ Bit. Overlay
Marathon Ave (Fort to Castle Oak) C&G, HMA
Castle Oak Dr (Ind Park to West of Maple Grove) C&G, HMA
Grassy Ln (Olde School to North End) C&G, HMA
Olde School Rd (Marathon to Maple Grove) C&G, HMA
Marathon Ave (Castle Oak to Fort) (Both Sides) Sidewalk
Olde School Rd (Marathon to Maple Grove) (Both Sides) Sidewalk
Castle Oak Dr (Marathon to Bruce) (North Side) Sidewalk
Castle Oak Dr (Industrial to Marathon) (Both Sides) Sidewalk

Project Pictures

Click here to view photos of construction projects.

Sign-up for Construction Project Updates

Click here to sign up for our Construction Project Updates Newsletter!

Bid Documents

All construction bid documents available for download at QuestCDN.

2016 Projects Ad for Bid Bid Form Bid Date
Contract 1-16
Miscellaneous Sewer and Water Main Construction and Street Construction
Ad for Bid 1-16 Bid Tab Form 1-16 02/16/16
 Contract 2-16
HMA Street Construction
Ad for Bid 2-16 Bid Tab Form 2-16 03/22/16
 Contract 3-16
Epoxy Pavement Marking
Ad for Bid 3-16  Bid Tab Form 3-16  04/19/16
 Contract 4-16
Concrete Pavement and Sidewalk Repair
Ad for Bid 4-16  07/26/16

City of Neenah Prequalification Form – Click for copy of form.

Future Projects

For the current five year street construction program link to Capital Improvements Program.
For a map of the five year street construction program link to 2013-2017 Capital Improvements Program Map.